Projects
Recent Projects
Our projects have included general construction repairs, new construction, painting, ashphalt repair and more on facilities in South Carolina.
![Midlands Tech Auditorium Painting](https://carbradesign.com/wp-content/uploads/2015/02/MidllandsTechPainting1.jpg)
Educational Facilities
Keenan High & Lower Richland High School Athletic Field Improvements
The Keenan and Lower Richland High School Athletic Field Improvements Project had a civil scope that consisted of existing field demolition, grading, storm drain installation, and new turf installation. A new asphalt paved track field was installed as well. CARBRA completed this project under the IDC Contract with Richland School District One.
- Field Demolition
- Grading
- Storm Drain Installation
- New Turf Installation
![](https://carbradesign.com/wp-content/uploads/2022/05/keenan-lower-richland-Athletic-Field-Improvements-3.jpg)
![Keenan & Lower Richland High School Athletic Field Improvements](https://carbradesign.com/wp-content/uploads/2022/03/keenan-lower-richland-Athletic-Field-Improvements.jpg)
![Roundtop Baptist Church Parking Lot Renovations](https://carbradesign.com/wp-content/uploads/2022/03/Roundtop-Baptist-Church-Parking-Lot-Renovations1.jpg)
Religious Facilities
Roundtop Baptist Church Parking Lot Renovations
This was a general construction project.
- Roadway Asphalt Repairs and Marking
Retail Locations
Tolliver's Barbershop
This was a general construction project.
- Complete renovation
![](https://carbradesign.com/wp-content/uploads/2016/06/Tolivers-Barber-Shop-oustide-after1.jpg)